Garage update

Over the last 5-6 weeks not much happened with the garage, it was waiting for the plasterer to return. Saturday two weeks ago the electrician came and put in the first fix electric, and couldn't go any further until the two remaining walls were plastered.

This week the plasterer returned, and finished off the two internal walls. With the reasonable weather outside he was able to dash some more too, and a couple more days outside should get the dashing done. Then it's just the bases to rub up.

Yesterday the electrician returned to start the second fix, and got on fairly well, although there is still a few hours work left.

No pictures I'm afraid, as the daylight hours are few, and by the time I remember to take some each day it is dark :)

Thursday, October 29, 2009

A week off

We have all been off work and school this week, and as usual we have been busy. I had quite a bit of tidying up to do to the paved area, and I had managed to get a Saturday or two at it, but what I needed was a sustained effort. I started on Monday, and finished this morning.

Lots of the edge flags had been cut, but not placed, and it took quite a bit of preparation to make the area ready for them. The adjacent sand and cement mix had hardened and needed chiseled out to enable new mix to be laid to bed in the edging.

There were kerbs to be laid for the edge at the
front, so we got that done too, and placed the flags in behind them.

Perhaps
the most challenging cutting I had to do was the bit around the manhole. This was tricky because the slabs that had been left out created a space that wasn't really very square, and also cutting slabs to fit inside the manhole cover was extremely delicate. Worth it in the end.

The doorstep at the patio was also finished, just this morning. I had to build the edge and then fill in the centre with concrete, and when that had hardened I laid the paving stones.

The plasterer has also been here, but only for two days, and has most of
the inside rubbed up, and all four corners done now. Lets hope it doesn't rain tonight!

Friday, October 16, 2009

Roof Tiles

After another bit of a break the contractor was back today and got the roof tiled. They intended to do it last Friday, but it was such a miserable day they just gave up and went home.

Today the tiles went on at an incredible rate, and late in the afternoon they had it finished.

As a bonus the plasterer arrived today, and by the end of the day he had three of the exterior walls scratched.

Sunday, October 11, 2009

At the beach

This morning instead of my normal Sunday lie-in I decided I would take advantage of the moderate Westerly wind and head to the beach.

I arrived at the beach just after sunrise, and had a reasonable session, although the waves were a little too huge for me. For the first time I was riding a little in my bad direction.

I can't wait until I'm out with some of the more experienced guys again, 'cause I'll be looking for some advice, and also its a little scary being out there on your own. If you lose your board, or get into any sort of trouble, you have no help, so I was being cautious, staying within my depth at all times etc. What I really need to do at this stage is start off out beyond the breaking waves, so I have more uninterrupted water to practice in. The problem with that further out, better water is that it is so much more dangerous.

Out of the water and packed up for just after 9am, driving back across the beach I spotted Alan, who is one of the other regulars. Spoke briefly, and left him to it, apparently he had a good session too. Can't wait until next time!

Thursday, October 01, 2009

Trusses on!

Today the trusses were put on. Yesterday the workmen were back and started the work, but really just got the preparation work completed. Today they came back, and very quickly finished the job.
The brickies were also back and almost finished off the pillars at the road. Just the pillar caps to go on.

The good thing about seeing the trusses on was that I could see the size of the room it gives above the garage - that's the place that all the stuff w
e should throw out, but will keep for years will stay. It will be a good size of a room.

Saturday, September 26, 2009

Step foundation


The slow progress continues on the paved area. Today we used the mixer that the builders have left to mix some concrete for the foundation of a step at the conservatory doors.

Friday, September 25, 2009

Saturday, September 19, 2009

Best day yet.

In March, when Marty and I were in California for 3 weeks with work we were determined to have a good holiday, as well as doing whatever work had to get done. Every day when we went somewhere we enjoyed it more than the previous day, Big Bear, Sunset Beach, San Diego, Vegas, Grand Canyon, Beverly Hills. Each day we acknowledged that we'd had the 'best day yet'. Well, today was another 'best day yet'.

A few months ago the guys at scoobyireland had arranged to hold a "rolling road" day, and today was that day. It had finally come round; it's something I've always wanted to do, I would have loved to have put my GTE Astra on the rollers as I'm sure it was pulling close to 200bhp.

Anyway, headed off this morning for AI Autosport near Randalstown, and was the first one there, so got first shot on the rollers. I'd hoped this wouldn't happen as it would have been nice to see what goes on before actually going. Phil reversed the car onto the rollers and they got it tied down with ratchet straps. Because my car was the first of the day the rollers had to be heated up, so he took the car up to 100mph and ran it there for a few minutes.

Then the run began, the car is held at 3000rpm for a few seconds to calibrate the machine, af
ter which the operator lets it rev lower, and then floors it. The graph is updated live on the machine, although its hard to see what is actually happening on the screen; there is so much information.

My car ran twice, once on SUL, and once on LPG. I was really curious about both runs because the car has 135000 miles on it, and IMO it has never really been going 100%, so I was expecting less than the stock 208bhp for the petrol, and slightly more on the LPG as it has a higher octane rating (apparently).

Wrong. 251bhp (219 at the wheels) on the SUL, and 240 (203 at the wheels) on the LPG.
Fantastic result, and although it cost £70 for the two runs, I think it was a good economy, as I was thinking about a chip, or boost controller, but sure now I don't need one, I'm already 20% over stock power!

Next it was off to Benone for a spot of kitesurfing. It was alright, first ride was the best going slightly upwind, after that it was a series of sinking, or crashing into waves etc. Then the wind died etc, so not a great session, but great to get out again for the first time in 3 weeks, after our wind drought!

Finally I have just spent over 7 hours painting in the living room. It's well overdue as with a coal fire burning there is a lot of soot. Now its got a nice fresh coat of paint. Actually found the job strangely enjoyable today, I'm sure that feeling couldn't last!

Thursday, September 17, 2009

Garage - Day 5 - Brickwork complete

The brickies finished off the brickwork of the garage today, so we have to wait for a week for the trusses to arrive.

While the brickies were here we decided to put their skills to good use, and they finished off the copings on the wall. This was probably a wise decision, as it took them about a full day in total, so I don't think I could have done nearly as good a job.

After marking out the sizings for the pillars and wall at the road we got the foundations dug and poured today. Now all we need is the building done!

Wednesday, September 16, 2009

Garage - Day 4



More work on the garage today, and we also marked out at the roadside where we hope to put pillars and a wall.

Friday, September 11, 2009

Garage - Day 1

The workers arrived today to start the garage. I expect it'll not take them long to put it up, at least they're getting great weather for starting.

Saturday, September 05, 2009

Moving shed


In preparation for the garage getting built we had to clear out the accumulated rubbish from the foundations. For the most part this meant lifting wood and other rubbish, but the biggest item was the garden shed, which was a quite substantial task.

After preparing the path we got the heavy lifting machinary in and got it delicately balanced on the forks. Matthew kindly drove it all the way around to its new resting position, where it will stay until the real garage gets done.

Now we just have to wait for the builders to turn up :)



Thursday, September 03, 2009

Up!


On day 4 out on the water I'm finally riding, only short distances, but still up. Once I made it over several waves, and couldn't believe how I got over each one! Looking forward to getting out again...

Friday, August 28, 2009

On the water again

The wind was just right again tonight, so I was back at Benone to pick up where I left off. This time I was able to go short distances before falling. I'm not ready for any competitions yet, but at least a little progress is encouraging! No pics or vids tonight, the multimedia crew let me down!

Wednesday, August 26, 2009

On the water - just about!


After months of waiting for wind that was the correct strength and the correct direction I saw the forecast for tonight, and left work as early as possible. On arrival at the beach at Benone I was pleased (although a little intimidated) to see three kiters already out on the water.

I headed over and parked up, introduced myself, and began to get set up.

After my first few disastrous attempts on the water one of the fellows came over and offered some advice, so I tried that for a while, until the handle came off at one side! Fortunately it was just a loose screw and I was quickly back in action.

Hours, and lots of attempts later, with more advice I was making some progress, "riding" for short distances before either sinking or being pulled over on my face.

I definitely am absolutely no good at this sport, but it definitely is the most fun I've had!

Unfortunately there are no pictures of me up on the board, one person suggested that it was because there wasn't a fast enough setting on the camera!

Thursday, August 13, 2009

Garage?

Last night we had the contractor who built our house back to give us a price for building a garage. Hopefully it'll come in at something reasonable, but we'll wait and see.

It is quite a coincidence today 6 years ago we had his quantity surveyor here pricing up the build of the main house. Link here: http://www.ccso.co.uk/sb/13Aug2003.html

Monday, August 10, 2009

Ozone Imp Quattro 1.5

New kite for the kids arrived today, its an Ozone Imp which is designed to be an introductory kite, and its perfect for learners. It flys really nicely, right around the window, but never has too hard a pull, exactly what I wanted. Good fun for me too!