While moving jobs this summer I had decided to take two weeks off in between employments. As always a list is compiled of things that should be done in the 'holiday'. This year that list had one item - slabs. We had left an area at the side of the house that needed to be laid with patio slabs, so the time had come to do it.
Just today, after 10 days work at the area I laid slab no 747 of 875 - that was the entire interior area completed; now only the cutting remains to be completed.
This is the result of the labour.
Thanks to all who helped, without whose help this could have not been completed in this time!